To seal the annular hole involving the casing and the borehole, cement grout is poured within the casing pipe ahead of it is actually lowered into the opening. The monitor is then fastened into the casing’s foundation. The conclusions in the soil test are applied to ascertain the display slot size. safe the region: in advance of drilling, make s